Filled PATH forms for Mumbai

Suggestions received by Karmayog to improve Traffic and Pedestrian conditions in Mumbai are displayed below, with the most recently posted suggestion first.

You can change the order of display by using the toggle feature provided for ‘Date’, 'Locality', to change the order of display as needed.

May 2017
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
103 25 May 2017 Ghatkopar West LBS Marg Painting of lanes Painting of Lanes should be made bold.
February 2016
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
92 27 Feb 2016 Marine Lines Marine drive duration of traffic signal to be increased/decreased Increase signal duration
91 25 Feb 2016 Worli Marine Drive - Haji Ali - worli Love Grove pumping station duration of traffic signal to be increased/decreased Trafifc signals must be operated
90 24 Feb 2016 Vile Parle East Dixit Road rampant double parking RTO Officers need to enforce the NO PARKING ZONE Strictly!
89 14 Feb 2016 Goregaon East GOREGAON JUNCTION OF WEH Obstruction of road BETTER IMPLEMENTATION OF STOP LINE AT SIGNALS
88 11 Feb 2016 Marine Lines NATHIBAI THACKERSEY ROAD rampant double parking INTRODUCE COLOUR ZONES FOR 2-WHEELERS AND 4-WHEELERS
87 2 Feb 2016 Goregaon West New link road Goregaon West abandoned vehicle parked Review parking
79 2 Feb 2016 Saki Naka andheri kurla rd,and khairani rd Obstructions on roads or pavements disciplinary actions which helps common men to reach home and workplace in time. in time
January 2016
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
78 19 Jan 2016 Malad West Goregaon Mulund Link Road Improvement in facilities for pedestrians Motorist Must Not overshoot Zebra Crossing at signals
77 6 Jan 2016 Mulund East Eastern Express Highway Traffic signal position is wrong Better management of traffic at the Eastern Express Highway / Mulund Goregaon Link road
76 4 Jan 2016 Colaba Rambhau Salgaonkar Rd police to be stationed here between ------ to ------- time More surveillance needed by traffic police, whether in person or via cameras
September 2015
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
75 18 Sep 2015 Bandra West TURNER ROAD BANDRA WEST abandoned vehicle parked MAKE NO PARKING ZONE ON TURNER RD FROM 10 AM TO 8 PM
74 11 Sep 2015 Ghatkopar East Jeejabai Bhosale Marg Add or remove One Way All vehicles to be diverted below amar mahal flyover for taking U turn
August 2015
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
72 23 Aug 2015 Goregaon East Sai Road and Krishna Vatika MArg Add or remove One Way Make the roads one way.
July 2015
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
71 25 Jul 2015 Kalbadevi Naresh Bothra rampant double parking Remove double parking by tempos, handcarts etc.
March 2015
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
70 30 Mar 2015 Santacruz East SANTACRUZ CHEMBUR ROAD speed breaker unnecessary remove the speed breaker at kapadia nagar signal.
February 2015
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
69 14 Feb 2015 Goregaon West BANDRA DAHISAR LINKING ROAD Right turn / left turn needed / not needed TO ALLOW RIGHT TURN TOWARDS MEGA MALL TO ANDHERI
68 5 Feb 2015 Bhandup West 90 Feet road, Lala Sheth Compound abandoned vehicle parked Illegal parking, double parking to be stopped, Abandoned cars towed away and no commercial vehicles to be allowed to park.
October 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
65 15 Oct 2014 Girgaon JAGANNATH SHANKAR SETH ROAD police to be stationed here between ------ to ------- time INCREASE FINE AND POLICE PRESENCE WITH OUTSIDE JURY
63 1 Oct 2014 Bandra West Perry Cross Road (Master Vinayak Cross Road Add or remove No Entry One Way and No Parking in the lane
62 1 Oct 2014 Kandivali West Shankar lane Right turn / left turn needed / not needed Stop right turns at the temple cross roads crossroads
August 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
61 31 Aug 2014 Andheri East Marol Maroshi Road duration of traffic signal to be increased/decreased taffic signal needed
60 25 Aug 2014 Bandra West S.v. Road Add or remove One Way Need of flyover for smooth traffic flow
58 24 Aug 2014 Fort Church gate station Shift pedestrian crossing Pedestrians to use subway
56 10 Aug 2014 Tilak Nagar Ghatkopar Mahul Road Painting of zebra crossing Provide lane marking, Zebra Lines and an islanding.
55 8 Aug 2014 Mulund West P.K.Road, Mulund West Obstructions on roads or pavements Ban parking of vehicles on P.K.Road - an arterial route
54 6 Aug 2014 Andheri East Marol Maroshi Road speed breaker required taffic signal needed
July 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
52 31 Jul 2014 Grant Road Naushir Bharucha Marg rampant double parking Implement Traffic Law of Parking
51 24 Jul 2014 Sion Bhanu Shanker Road gap needed in divider for pedestrian Gap Needed in divider for pedistrian
50 22 Jul 2014 Vile Parle East Nariman Road Obstructions on roads or pavements Narrow the footpath width and put board urging people to use it
49 12 Jul 2014 Ghatkopar East Vasantrao naik Marg Obstruction of road Remove service road encourgement from fish market.
48 6 Jul 2014 Dharavi Krishnan Menon Road (90 feet Road) Improvement in facilities for pedestrians please correct the street light systems on 90 feet road as per above mentioned complaints and suggestions.
47 1 Jul 2014 Tilak Nagar Amar Mahal = Ghatkopar Road Improvement in facilities for pedestrians Preventing accidents for pedestrians at Amar Mahal area
June 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
46 30 Jun 2014 Borivali West Junction of New Link Road, LT Road & Chandavarkar Road (At the Signal) Painting of zebra crossing ZEBRA CROSSING with STOP Sign to be Painted on the Road.
45 29 Jun 2014 Byculla Babasaheb Ambedkar Road Obstructions on roads or pavements Sincere control on activities of vendor and vehicles
44 22 Jun 2014 Bandra West st johns road police to be stationed here between ------ to ------- time 6.30 to 10.00 pm, 9.00am to 11,00 am
43 11 Jun 2014 Saki Naka Asalpha Sakinaka Road rampant double parking Ban all parking in the centre median of the road. Even Ambulances cannot take victims to hospital on time.
April 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
41 24 Apr 2014 Goregaon East aarey road road divider needed put a road divider from w.e.highway till pravasi industries via udipi vihar
40 24 Apr 2014 Goregaon West s.v.road duration of traffic signal to be increased/decreased keep east west traffic time 180 seconds
39 24 Apr 2014 Goregaon West s.v.road Obstruction of road reduce crossroads all over this lemgth of road
38 24 Apr 2014 Goregaon East AAREY ROAD GOREGAON EAST road divider needed PUT ROAD DIVIDER ON AAREYROAD AND UPTO PRAVASI INDUSTRIES
37 5 Apr 2014 Santacruz West Tilak Road, Santacruz (W) speed breaker required Create a speed-breaker on Tilak Road in Santacruz (W)
36 2 Apr 2014 Malad East Western Express Highway police to be stationed here between ------ to ------- time Police cop from times of india till dindoshi
March 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
35 29 Mar 2014 Malabar Hill Siri road - Chiranjilal Loyalka marg Obstruction of road open the road for traffic
34 28 Mar 2014 Andheri West Andheri Link Road Improvement in facilities for pedestrians Foot-bridge for Andheri Link Road
32 28 Mar 2014 Andheri West Andheri Link Road Improvement in facilities for pedestrians Foot-bridge for Andheri Link Road
February 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
29 3 Feb 2014 Fort H Somani Road Improvement in facilities for pedestrians Policy Paper for Pedestrian Movement in Bangalore
January 2014
Form No. Date Mumbai Locality Name of Road Category of problem Proposed suggestion
23 4 Jan 2014 Goregaon East Mohan Gokhale Road, Improvement in facilities for pedestrians Footpaths for pedestrians
24 4 Jan 2014 Goregaon East Goregaon East railway station road toward Aarey Check naka Improvement in facilities for pedestrians Skywalk for people
25 4 Jan 2014 Goregaon East Aarey Check Naka, Goregaon Gokuldham Junction Painting of zebra crossing Painting of Zebra Crossing and lane markings

Pages